Deschutes Valley Trail: Tumwater Historical Park to Brewery Park at Tumwater Falls

Print
Press Enter to show all options, press Tab go to next option

Deschutes Valley Trail: Tumwater Historical Park to Brewery Park at Tumwater Falls

April – December 2020

The Deschutes Valley Trail was first envisioned in the Tumwater Trails Plan. It was later added to the Thurston Regional Trails Plan and subsequently awarded federal funding administered through Thurston Regional Planning Council for design of the trail system. The 2.5-mile trail corridor is designed to serve as a regional asset providing community linkages or connections to the regional trail system that surrounds Tumwater.

Project Description

This project includes construction of the Tumwater Historical Park to Brewery Park segment of the Deschutes Valley Trail. The meandering trail segment will be constructed on a historic train rail alignment on a slope paralleling and overlooking the Deschutes River. It will have a 10 to 12-foot wide paved surface with gravel shoulders. This trail segment will be set apart from other trails in the area given the rich history of the alignment; continuous views of the Deschutes River and Tumwater Falls; and unique design features including exposed bedrock, rockery walls, and custom railing. Extensive tree clearing and vegetation removal is necessary for the trail projectnew vegetation and trees will be planted.

Schedule

Planning (Complete) – 2011 to 2017
Design (Complete) – 2017 to 2020
Right-of-Way Acquisition (Complete) – 2018 to 2020
Construction – Estimated April 2020 to December 2020.

Road Closures

There should not be any notable traffic impacts as the project is entirely outside of the public right-of-way. Some minor delays may occur due to importing and exporting material for the project. There may limited road closures during tree removal.

Brewery Park Impacts

There will be limited parking available at Brewery Park at Tumwater Falls and interim closures of the existing walking trail in the Park. The parking area immediately next to Deschutes Parkway will be closed for the duration of the project. The trail closures may be frustrating, but are necessary during construction of an extensive retaining wall structure adjacent to the Falls Terrace Restaurant.

Deschutes Valley Trail: Tumwater Historical Park to Brewery Park (Tumwater Falls)PDF file

Deschutes Valley Trail Map

 

Deschutes Valley Trail Pullout/Over

 

 Project Funding

This $1,915,000 construction project is partially funded by federal grants administered by Thurston Regional Planning Council:

  • Federal Grants - $1,118,069
  • Local Funding - $796,931

Project Personnel

  • City of Tumwater Project Inspector: To be determined
  • City of Tumwater Project Manager: Brandon Hicks
  • Name of Contractor Project Superintendent: To be determined
  • Design Firm: Robert W. Droll

If you have any questions or concerns, contact Brandon Hicks, City Engineer, at (360) 754-4140 or email bhicks@ci.tumwater.wa.us.