Show/Hide

Tumwater City Hall, Tumwater Library, and Old Town Center will be closed Monday, January 20, 2020, in observance of Martin Luther King Jr. Day.

Water, sewer, and street problems can be reported by calling the Public Works Hotline at (360) 754-4150. Police, fire, and emergency medical response services will be available as usual. Emergency? Call 9-1-1

Capitol Boulevard Project

Print
Press Enter to show all options, press Tab go to next option

Capitol Boulevard Corridor Improvements 

Capitol Boulevard Corridor Plan Projects Completed:

Capitol Boulevard Corridor Plan

Capitol Boulevard Feasibility StudyPDF file


Feasibility and Pre-Design

Objective

The Capitol Boulevard Corridor Feasibility and Pre-Design project was to validate the transportation recommendations included in the Capitol Boulevard Corridor Plan pdf-icon-sm, Final August 2013, manage necessary or recommended changes resulting from the validation process, prepare preliminary design for the Capitol Boulevard corridor improvements from approximately M Street to Israel Road including the development and recommendation of alternatives to manage the vehicular and non-motorized traffic at the busy Capitol Blvd and Trosper Road intersection. The project includes federal funding and work will be performed in conformance with state and federal guidelines. 

With funding from a federal grant the City executed a contract with SCJ Alliance for the project work.  The work completed to date includes:

  • Development of the roadway cross-section along Capitol Boulevard
  • Preliminary corridor schematics with roundabouts, medians and traffic calming treatments for the local neighborhood street entries.
  • Development and ranking of alternatives for the Capitol/Trosper Intersection
  • Preliminary schematics for the preferred Capitol/Trosper Intersection alternative.

For more information about the work please refer to these documents:

Step Two Ranking of Alternatives pdf-icon-sm 19 MB

Capitol Blvd Corridor Drawings pdf-icon-sm 5 MB 

I-5 Trosper Road Final IJR pdf-icon-sm 12 MB