City of Tumwater
Development Reviews 2004 Year-to-Date
September
August
July
June
May
April
March
February
January
September 2004
Feasibility-Robert & Kady Rensel-4220 Armstrong Avenue
Subdivide existing parcel into two parcels
Feasibility-Strathmore Business Park-2900 29th Avenue
Construction of 4,200 SF building with covered parking
Feasibility-Vine Street Parking Lot-Tumwater Boulevard
Construction of an 82 stall parking lot
Feasibility-Tri Vo/Hatton Godat-North end of Lambskin Street
Subdivide 40 acres into 100 single-family lots through the provisions of the Preliminary Plat and PUD process
Feasibility-Summit at Tumwater Hill-Crosby Blvd at Barnes Blvd
Development of 11.51 acres for senior citizen independent living facilities
Feasibility-Kathy & Rick Rayment-7643 Old Highway 99
Pre-engineered metal hangars
Feasibility-Airport Phase II, Reid Middleton-7643 Old Hwy 99
Runway extensions and taxiways
Feasibility-Johnson Development-3rd Avenue and G Street
Construction of a single-family home on both lots or a duplex on each lot
Feasibility-New Market Lab Tech Building-7299 New Market Street
Construction of approximately 20,000 SF lab-tech building
Feasibility-Bright Ridge Village-Barnes Boulevard
Construction of a mixed housing development to include 153 units; 88 town homes, 17 cottages/bungalows, 48 single-family
Preliminary-Color Graphics-2540 Crites Street
Construction of a building to house Color Graphics retail and manufacturing
Formal-Vine Street Project-6501 Capitol Boulevard
Construction of a 54,000 SF office building with 201 parking stalls
Back to Top
August 2004
Feasibility-Richardson Homes & Land-2305 Chapparel Drive
Subdivide 5 acres with existing house into maximum number of lots allowed
Feasibility-Tree Source Industries, Inc.-8277 Center Street
Pave existing rocked lumber yard and in front of truck stop. Total paving area estimated at 112,000 SF
Feasibility-Tumwater Highlands-93rd Ave. SE & Old Hwy. 99
Subdivision of 126 acres into approximately 500 residential lots
Feasibility-Hardcastle Car Wash-6028 & 6030 Capitol Boulevard
Construction of a drive through car wash
Feasibility-Kaufman Development-88th Avenue SE
Subdivision of 43 acres into an industrial park
Preliminary-Lee Ingrim/Chris Merritt-6th Avenue
13-lot duplex subdivision with associated storm drainage, water/sewer and frontage improvements
Preliminary-Vine Street Project, Glenn Wells-6501 Capitol Boulevard
Construction of a new 3-story 54,000 SF building with 201 parking stalls
Back to Top
July 2004
Feasibility-Les Whisler-865 RW Johnson Blvd SW
Addition of 20 feet to existing building for use as additional open storage
Feasibility-Lowe's Chiropractic Office-128 D Street SW
Construction of an office with extra space for leasing
Feasibility-Rod & Anita Dietz-2221 Sapp Road SW
Subdivide and create additional lots
Feasibility-Tumwater Square Expansion-3333 Capitol Blvd SW
Single story addition to existing office building
Feasibility-Lee Gas Station & Store-Harper Road at Tumwater Blvd
Construction of a gas station and convenience store
Feasibility-Bill Turner, Balcom Plat-1904 Sapp Road SW
Subdivide 4.05 acres into 12 lots with frontage improvements on Sapp Road
Feasibility-Hayes Short Plat-511 Delta Lane SE
Short plat
Feasibility-Derek Marty, Tumwater Ridge-585 5th Avenue SW
Subdivide site into residential lots. Possibly 18 single-family lots, 9 duplex lots, or a mix of both
Formal-Gard Commercial-202 Lee Street SW|
Construction of four 3,000 SF buildings
Formal-Peter G. Schmidt Elementary-6600 Capitol Blvd SE
Replace covered play area with a gymnasium and improve parent drop off and parking areas
Back to Top
June 2004
Feasibility-Cindy & Dale Martin-6029 Capitol Blvd SW
Demolition of existing building, fill in and prepare new building site for future building
Feasibility-Vine Street Project, Glenn Wells-6500 block Capitol Blvd
Construction of a two-story, 36,000 SF office with 212 parking stalls
Feasibility-Scotty Ruegsegger-114 N 5th Avenue SW
Construction of 2-story townhouse units; 1,400 SF each: 2 and 3 bedrooms
Feasibility-Centerfield Construction-905 8th Avenue SW
Proposed 30-lot residential subdivision
Feasibility-Harbor Wholesale Foods-7845 Center Street SW
Two-story, 1,000 SF office addition to existing office/warehouse building
Preliminary-Jay Fuller, Custer Way Remodel-510 Custer Way SE
965 SF addition to existing three-level building
Preliminary-Chris Merritt, Smith & Larson-6th Avenue SW
17-lot duplex subdivision with associated storm drainage, sanitary sewer, water, and frontage improvements
Preliminary-Tumwater Hill View Homes-423 N 3rd Avenue SW
Tree removal for construction of four single-family homes with view, and the selling of 5 additional lots with view
Preliminary-BHR-Mental Health Housing-1275 2nd Avenue SW
Gut and remodel (plus addition) to existing building to convert into single occupant mental health facility providing permanent housing
Preliminary-Old Towne Plaza- SE corner Capitol & Tumwater Blvd
Proposed commercial development with a variety of users
Preliminary-Nazarene Church-940 Israel Road SW
Additions to existing building, two outbuildings, parking, and storm drainage facilities
Formal-Washington Light Industrial Facility-811 88th Avenue SE
Phased development for office warehouse building and parking, warehouse, fabrication, and repair facilities
Formal-Harbor Wholesale Foods-7845 Center Street SW
Two-story, 1,000 SF office addition to existing office/warehouse building
Back to Top
May 2004
Feasibility-Buddy & Tricia Davis-6821 Littlerock Road SW
Demolition of a single-family home and storage shed and new construction of a 4-plex and a carport structure
Feasibility-Henderson Multi-Family-6545 Henderson Blvd SE
Conceptual planning on 10 acres of Henderson Blvd
Feasibility-Hearthstone II-210 Pinehurst Drive SW
Construction of 2000 SF +/- commercial building with connecting duplex
Feasibility-John Gipson-1603 Bishop Road
Divide lot into 4 parcels and construct 1 triplex and 2 duplexes
Feasibility-Chul Kim, Sunrise Hills-Woodland Drive to Sapp Road
Proposed subdivision of 34 single family lots
Feasibility-Israel Road Mixed Use-Israel Road at I-5
Mixed use, retail and multi-family development
Feasibility-Tumwater Police Building-555 Israel Road SW
Construction of 15,000 SF police station
Feasibility-Reserve at Somerset-900 Linwood Avenue SW
33.3 acres to be subdivided into 154 lot residential plat in SFM zoning and served by city water and sewer
Feasibility-Advanced Prefinish-2733 Crites Street SW
Installation of a spray booth to spray stains and lacquers on raw wood
Preliminary-Johnny's Auction Center-Tumwater Blvd & Old Hwy 99
Construction of a two-story building to accommodate auction and retail sales; including site work and associated parking
Preliminary-Four-Plex Aircraft Hangar-Port of Olympia
Construction of airplane storage hangars
Preliminary-Chris Merritt/Lorenz Schock-7th & 8th Streets
Provide 8th street extension, utility services, and driveways to 10 lots
Formal-Jang Drive-Thru Espresso-5310 Capitol Blvd SE
Construction of a drive-thru espresso stand
Back to Top
April 2004
Feasibility-Portable Batch Plant-6070 Linderson Way
Portable batch plant for concrete mixers
Feasibility-C. Denney/City of Tumwater Parks-Simmons Roadway
Construction of a pedestrian trail connecting Tumwater's Historical Park to the trail system at Tumwater Falls Park
Feasibility-William & Dene Hartman-405 Hartman Street SE
Two-lot short plat
Feasibility-Gerth Street Building-1st Lot East of 222 Gerth Street
Construction of a two-story office/retail building, approximately 5,000 SF
Feasibility-Xpress Lube & Carwash-415 Cleveland Avenue SE
Removal of pump island at Exxon and addition of carwash and express lube
Preliminary-Jang Drive-Thru Espresso-5310 Capitol Blvd SE
Construction of a drive-thru espresso stand
Preliminary-Washington State Light Industrial Park-811 88th Av SE
38-acre parcel to house office warehouse, warehouse, fabrication and repair facilities, and parking
Preliminary-Tumwater School District #33-6600 Capitol Blvd SE
7,765 SF gymnasium, 4,000 SF covered play area, and updated playground at Peter G. Schmidt Elementary School
Preliminary-City of Tumwater-6004 SW Glenwood Drive
Construction of SW Neighborhood Park multiple use park facility
Preliminary-Old Towne Plaza-SE Corner Capitol at Tumwater Blvd
Development with a variety of users; retail, commercial, fast food, banking, car wash, etc.
Formal-L.G. Isaacson-2120 & 2140 Mottman Rd SW
Phase I: 1,470 SF addition. Phase II: 1,400 SF new building
Back to Top
March 2004
Feasibility-Richard & Mahona Sampson-207 Lee Street SW
Conversion of existing residence into a small office for an insurance agency
Feasibility-Bruce & Pat Shattuck-1359 2nd Avenue SW
Remodel residence to accommodate full service commercial usage
Formal-Leonard Trabka Trosper Mini & RV-5128 Joppa St SW
Addition of three buildings: 2200sf, 3000sf, & 4400sf for mini and RV storage
Formal-L.G. Isaacson-2120 & 2140 Mottman Road SW
Phase I: 1470 SF addition to existing building.
Phase II: 8400 SF (1st floor) and 3000 SF (2nd floor) new building
Back to Top
February 2004
Feasibility-Airport Texaco Car Wash Addn-7219 Old Highway 99 SW
Construction of a new car wash building on the existing Texaco station site
Feasibility-Lemon Grass Restaurant-6003 Capitol Blvd SW
Proposed construction of 7,000 SF of retail/restaurant space and 6,000 SF office/retail space
Feasibility-Tree Source Industries, Inc.-8277 Center Street SW
Remodel to replace existing canter line with an EDLF in-feed system. 100'x200' expansion of existing building and potential relocation of the residual bins
Feasibility-Lorenz Schock-7th & 8th Avenues
Extension of 8th Avenue, paving sidewalk, curbing, gutter
Preliminary-Stephens Development Site-2250 Mottman Rd SW
Phase II that includes the construction of a 19,580 SF structure and the future addition of 3,750 SF and a parking lot
Formal-Trosper Road Multi-Family-1619 Trosper Rd SW
Develop parcel into 5 multi-family buildings (3 duplexes, 2 triplexes) for a total of 12 dwelling units with associated paved access and utilities
Back to Top
January 2004
Feasibility-Alex Jang-5310 Capitol Boulevard SE
Construction of a drive-thru Espresso shop
Feasibility-Deschutes Watershed Center, Department of Fish and Wildlife-Pioneer, Tumwater Falls & Historical Parks
Hatchery Facilities
Feasibility-Bob Lee, Elm Street Subdivision-6400 Capitol Blvd SE
Subdivide 9.7 acres into 18 single-family lots
Feasibility-Hearthstone II, Johnson and Davis-T Street at Pinehurst
Construction of two mixed use buildings consisting of nine apartment units and two office suites with approximately 950 to 1000 SF
Feasibility-Color Graphics-2540 Crites Street SW
Construction of a facility for warehouse, offices, retail sales and sign printing
Feasibility-Robert Lee/Jamie Harris-6400 Capitol Blvd SE
Construction of a 10'x10' Espresso stand and a 10'x10' storage shed
Feasibility-Roy Allen/Isaacson Properties-2140 Mottman Road SW
Phase I: Add a 25' storage bay on to existing shop. Phase II: Complete development started in 1991 and construction of a 60'x140' metal building
Preliminary-Trosper Road Multi-Family-1619 Trosper Road SW
Development of 5 multi-family buildings (3 duplex, 2 tri-plex) for a total of 23 dwelling units with associated paved access and utilities
Preliminary-Tumwater Blvd Espresso-711 Tumwater Blvd SW
Leasing 2,043 SF of parcel area for a drive through Espresso stand, with associated utility connections
Preliminary-Bill Wagner, Hampton Adult Daycare-1400 Trosper Rd
Single story residential style adult day care center to serve 18 people
Formal-Jay Fuller, Custer Way Remodel-510 Custer Way SE
Remodel existing building and construct 2,200 SF commercial building with associated parking
Back to Top
Back to Development Review
Updated:
03/04/2008