Development Reviews 2003 Year-to-Date


December
November
October
September
August
July
June
May
April
March
February
January


December 2003

Feasibility-Deschutes Animal Clinic-7106 Littlerock Rd SW
Construction of a 10,000 SF building for use as a veterinary clinic

Feasibility-Old Towne Center-Capitol Blvd & Tumwater Blvd
Commercial development with a variety of users

Preliminary-Leonard Trabka RV & Mini Storage-5128 Joppa St SW
Addition of three buildings for RV and mini-storage

Back to Top


November 2003

Feasibility-Bell General Office Building-915 Trosper Road SW
Construction of a 2,240 SF general office building

Feasibility-State of Washington Light Industrial-88th Avenue SE
37-acre development to house office warehouse building & parking (8 acres). Office, warehouse, fabrication & repair facility (25 acres). Related storm drainage facilities.

Back to Top


October 2003

Feasibility-Sawyer Group-7106 Littlerock Rd SW
Four-lot short plat and phased construction of site to include at least one 4,500 SF professional services building

Feasibility-Olympic Capital Group-RW Johnson Blvd at Sapp Road
Eleven-lot duplex PRD, gated, with private roads

Preliminary-John Davis/Allen Johnson-T Street and Pinehurst area
125-unit multi-family apartment complex

Preliminary-Lee Ingrim Short Plat-7th Avenue SW
Subdivide 2.5 acres into 15 residential lots with associated roadway, drainage, water and sanitary sewer improvements

Preliminary-Airdustrial Office Park-7643 Old Highway 99 SE
Four 4-story buildings (government office space)

Preliminary-Jay Fuller, Custer Way Remodel-510 Custer Way
Remodel existing building and construct new paved parking and landscape areas. Include provision to duplicate existing building adjacent to the first

Formal-C & N Investments, Mottman Plaza-2500 Mottman Road SW
Three phase construction of six building office / retail park with associated drives and parking

Back to Top


September 2003

Feasibility-Speedway Brewing Company-6400 Capitol Boulevard SE
Small 10-barrel brew pub located in existing 1960 SF structure adjoining Eagan's Big Tom next to Z Street

Feasibility-Glascow Property Division-1005 Irving Street SW
Division of property into two lots, per surveyor's description

Feasibility-Kingswood Center Petsmart-1401 Kingswood Drive SW
22,000 SF Petsmart pet care center with vet and grooming services, 88 parking spots, and truck access at rear

Feasibility-Randy Selness Short Plat-1527 Bishop Road SW
Division of property down the middle

Feasibility-Johnny's Auction-Tumwater Boulevard at Hwy. 99
16,000 SF of mixed use for office / retail and auction facility

Feasibility-David Gubbe Short Plat-2650 Sapp Road SW
Short plat to create lots Preliminary-C & N Investments-2500 Mottman Road SW Six-building commercial office and retail complex

Preliminary-Valley Athletic Club
Addition of two-story office, spa, and entry. Convert tennis courts to parking and add two new tennis courts at the south end

Preliminary-Town Center East Building III-4833 Tumwater Valley Dr
Construction of 3 to 5 story, 156,900 SF office building

Formal-Tumwater Office Building-7345 Linderson Way SW
Construction of 4-story, 200,000 SF office building with parking on portion of 21-acre site

Back to Top


August 2003

Feasibility-KJA Enterprises, Inc.-5120 Henderson Blvd.
Subdivision of 7.98 acres into 30 to 32 lots

Feasibility-Cleveland Construction, Inc.- 7643 Old Highway 99
Construction of a 9-unit T-hangar and 5-unit box/executive hangar facilities at the SE lot of the general aviation district

Feasibility-Royal Bean Coffee Drive-Thru-Tumwater Boulevard
Construction of a 14x21 drive-thru espresso stand

Feasibility-Color Graphics Retail-27th Avenue & RW Johnson
Construction of facility to include retail sales of sporting goods, color graphic products, graphic/sign printing and 7,000 SF of general purpose lease space

Feasibility-K9 to 5, Dog Day Care-3625 Capitol Boulevard
Use existing residence to provide a place for a doggy daycare

Feasibility-Mike Opitz, Trosper Road Short Plat-1619 Trosper Road
Develop 1.12 acre parcel into 5 duplex lots with associated improvements

Preliminary-Tumwater Office Building-Tumwater Blvd. & Linderson
200,000 SF, 4-story office building with parking Formal-Minks Plaza

Expansion-5725, 5741, 5743 Littlerock Road
Construction of 3 buildings and 1 building addition. 1 building to be a credit union and 2 buildings will house small retail businesses

Formal-Brian Lloyd, Trosper Woods Apartments-1840 Trosper Road
Multi-family housing development

Formal-Chris Sieg, Capitol Perks Espresso-3310 Capitol Boulevard
Construction of a drive-thru espresso unit

Back to Top


July 2003

Feasibility-Tumwater Hill View Condos-423 N 3rd Avenue SW
Development of a clustered view condo project

Feasibility-Tumwater Veterinary Addition-1716 Lake Park Drive
1200 SF addition to east side of building

Feasibility-Olympic Crest Coffee Roasters-6531 Capitol Boulevard
Addition of a portable 8x16 drive-thru to front of property where existing office, warehouse & showroom will be utilized

Feasibility-John Backman-415 Cleveland Avenue
Change of use from Exxon gas to retail

Feasibility-Corps of Engineers Expansion-921 4th Avenue
Parking lot expansion.

Feasibility-Kobza Home Builders-705 T Street SE
Subdivide 10 acres into 42 single family lots

Back to Top


June 2003

Feasibility-Elizabeth Lloyd-818 Ferry Street SW
Subdivide 1 large lot into 2 lots

Feasibility-Dan Sandy/Valley Athletic-4833 Tumwater Valley Drive
Office & spa addition

Feasibility-Jones Quarry-2840 Black Lake Blvd
Tire wash, asphalt road and parcel adjustment

Feasibility-C & N Investments-RW Johnson Blvd. & 25th Avenue
Four-lot short plat with future development

Feasibility-Lee Ingrim-7th Avenue and Barnes Blvd
Subdivision of 2.5 acres into 11 lots in order to construct duplexes

Preliminary-Glenn Wells/Town Center East-121 Israel Road
Five-story 156,900 SF office building

Back to Top


May 2003

Feasibility-Brian Reynolds/Airborne-Olympia Airport
Construction of an 11,950 SF - 50' x 239' hangar

Feasibility-John & Virginia Balcom-1904 Sapp Road
Subdivision of 4.05 acres for future construction of residential homes

Feasibility-Todd Robinson & Dale Stirn-5030 Joppa Street
Construction of a pre-engineered, steel, type II-N, 2-story warehouse

Feasibility-Emerald City Pizza/Chuck Henderson-5300 Capitol Blvd
Remodel and addition to existing Pizza Hut

Feasibility-Maria & Vito Chiechi-1710 Odegard Road
Development of property to construct three 2-plexes or two 4-plexes

Feasibility-TSAVO/F. Allen Johnson-SW Corner, Pinehurst & Capitol
Three commercial buildings; need utility and street improvement information

Formal-Jim Morris & MPH Holdings LLC-1520 Irving Street
Commercial, retail & office space

Back to Top


April 2003

Feasibility-Henderson Rezone-6545 Henderson Boulevard
Down zone due to limited access; need information on water & sewer

Feasibility-Nazarene Church Expansion-940 Israel Road SW
Expand existing church and erect new signage

Feasibility-Newlean Duplex-519 G Street SW
Information on construction of a duplex

Feasibility-Hayes Short Plat-511 Delta Lane SE
Short plat information

Feasibility-Connor Corner Subdivision-4302 Cleveland Avenue SE
Split 1 parcel into 2 for purposes of building a second residence

Formal-Hot Shotz-6901 Capitol Boulevard SW
Drive-Thru Espresso.

Back to Top


March 2003

Feasibility-Echols Custom Home-2541 Sapp Rd SW
Custom home building, planning and engineering information

Feasibility-Ingrim Short Plat-4821 Rural Rd SW
Boundary line adjustment followed by a 2-lot short plat

Feasibility-Southgate Center Addition-5103-5109 Capitol Blvd
Construction of a new 4,400 SF building with proposed site improvements

Feasibility-SW Neighborhood Park-Glenwood Drive Vicinity
18-acre park. Parking, baseball and soccer field, play area, picnic shelter, trails

Feasibility-Nevitt/Crosby Heights-Crosby Blvd & Sapp Road
Subdivision of 10.7 acres into 33 lots

Formal-Joppa Street Mini-Storage-5020 Joppa St SW
Construct four 3,000 SF storage buildings, drives, walks, and storm drainage

Back to Top


February 2003

Feasibility-Keith Weaver-3805 Hoadly Street
Subdivide parcel into single family residential lots

Feasibility-Chul Kim-Sapp Road
Proposed subdivision of approximately 11 acres; 35 single-family lots

Feasibility-F. Allen Johnson-226 Pinehurst Drive
Two- or three-story, 28 unit apartment complex

Feasibility-Steve Tipton-301 "T" Street
Widen intersections at Alpine Village and close entrance on Pinehurst

Feasibility-Cho & Lee Investments-5310 Capitol Blvd
Remodel and add 1900 SF addition to existing building

Preliminary-Glenn Wells/Vine Street-Capitol Blvd
Two office buildings - 230,605 SF plus a 2-story parking structure

Preliminary-Cho & Lee Investments-5310 Capitol Blvd
Remodel and add 1900 SF addition to existing building

Preliminary-Bob Thompson/Standard Oil-670 Trosper Road
9 x 14 Espresso drive-thru at Trosper Chevron parking lot

Preliminary- Debora Davis & Keith Porter-231 Dennis Street
Remodel existing house into a daycare center

Formal-Randy Johnson-7717 New Market Street
40 x 60 pre-fab, metal storage building, non-heated, non-insulated

Back to Top


January 2003

Feasibility-Herzog Ent. Inc.-4512 Cleveland Avenue
Construct single-family, duplexes, or town houses

Feasibility-Jeff Pantier-635 Hanson Street
Plat/PUD process to subdivide 6 acres into 14 single-family residential lots

Feasibility-Scott Ritter-1629 Trosper Road
3-lot short plat; save home on site and relocate building from Littlerock Rd.

Feasibility-F. Allen Johnson-"T" Street
Boundary line adjustment to construct office and 2 single-family rental units

Feasibility-Robert Walker-North of Delta Lane on Cleveland Avenue
Short plat for single-family and/or duplex construction

Preliminary-Ken Brogan-5020 Joppa Street
Construction of four 3,000 sq. ft. storage unit buildings

Preliminary-Al Johnston Designs-6327 Capitol Blvd. SW
Replace existing building with restaurant and two retail areas

Preliminary-Jim Morris-1520 Irving Street
Retail office space: renovate existing building and construct office buildings

Preliminary- Jim Haack/Brad Kisor-5727 Littlerock Road
Commercial/retail renovations and additions to existing retail building

Formal-Hatton, Godat & Pantier-1600 block of Bishop Road
Four multi-family dwellings totaling 10 units with utilities & parking

Back to Top