December 2002Presubmission-Jerry Olson-2149 Sapp Road
Division of a 16-acre parcel into 3 parcels

Presubmission-Don Grieben-End of "T" Street
Preliminary plat, 10 acres, single-family land use proposed

Feasibility-Robert Gault-6901 Capitol Blvd
Construction of drive-up/walk-up espresso cart

Feasibility-John Backman-Airdustrial Way & Capitol Blvd
Short plat, BSP, information on access, setbacks, parking, etc

.Feasibility-F. Allen Johnson-217 Pinehurst Drive
Construction of eight 4-plexes or a 32 unit apartment complex

Feasibility-Bill Boad-9125  93rd Avenue
Construction of 3 steel buildings for leasing purposes and storage

Feasibility-Marcus Ruem-6901 Capitol Blvd
Install espresso stand

Feasibility-James D'Aboy-Miller Brewery
Wastewater treatment plant

Preliminary-Paul Mickelson-7702 Terminal Street
Installation of canopy cover over walkway

Preliminary-Wright Runstad- Airdustrial Way & Linderson Way
200,000 sq. ft. 4-story state office building

Formal-Stacy Simpson-1655 South Street
74' x 44' 6-bay unheated vehicle storage building

Back to Top


November 2002

Feasibility-Rich Greene-2429 Tyndell Circle
BLA or short plat to increase size of lot 16, along with construction of home and/or rental unit

Feasibility-Mitch Snyder-501 "C" Street& 315 - 5th Avenue
Divide 2 lots into 3 and construct 3 single-family residences

Preliminary-Pat McCloskey-5033 Joppa Street
Addition to existing building and addition of an auto spray booth

Preliminary-Hatton Godat, Pantier-1600 block of Bishop Road
Construction of 10 residential units with associated utilities & parking

Back to Top


October 2002

Presubmission-C & N Investment-Mottman at R.W. Johnson 
Binding site plan

Feasibility-Randy Johnson-7711 New Market Street
Add a building to house paint spray booth and head blaste
r

Feasibility-Randy Johnson-7717 New Market Street
Construction of a 40' x 60' metal storage shed

Feasibility-Jeff Pantier-7th & Desoto
Develop 4 existing parcels into 8 dwelling units; boundary line adjustment

Feasibility-Jeff Kennedy--5727 & 5733 Littlerock Road
Request for building and transportation requirements in order to develop

Preliminary-Stacy Simpson-1655 - 2nd Street
Construction of a 74' x 44', 6-bay vehicle storage building

Back to Top


September 2002

Presubmission-David Kettel-1221 & 1223 - 2nd Avenue
Short Plat

Presubmission-Barghausen Engineers-5325 Littlerock Road
Short plat existing shell gasoline facility into two stand alone lots

Feasibility-Debora Davis-231 Dennis Street
Remodel house into daycare center

Feasibility-Brandi Murphy-6901 Capitol Blvd
10' x 12' drive-thru espresso business

Feasibility-Ken Brogan-5020 Joppa Street
Construction of mini-storage facility for vehicles, general household, etc.

Feasibility-Pat McCloskey-5033 Joppa Street
Add on to existing building and addition of a paint spray booth

Feasibility-Sheila Rhoade-415 Cleveland Avenue
Espresso business in office area of Exxon gas station

Preliminary-Dave Spiller/Hatton, Godat, Pantier-1520 Bishop Road
Twelve office/medical buildings with parking lots

Preliminary-Scott Anderson, Anderson & Boone-2030 Mottman Road
Subdivide into lots A&B; with A being 10,000 sq. ft. and B a later phase of construction of 13,860 sq. ft.

Formal-Brian Reynolds-Port of Olympia, Old Hwy. 99
Aircraft hangar

Formal-Frank Kirkbride-5745 Littlerock Road
Two buildings, parking, landscaping, stormwater treatment & detention

Formal-Cathie Carlson, The Shea Group-7380 New Market Street
Two - 100,000 sq. ft. 4-story office buildings with plaza, etc.

Back to Top


August 2002

Presubmission-Rob Cook-3805 Hoadly Street
Information on dividing 5 lots

Feasibility-Jay Fuller & Brian Regehr-502 Custer Way
Information on drawings and specs required

Feasibility-Phil Sharp-226 Pinehurst Drive
2 & 3-story, 28-unit apartment complex with 56 parking stalls

Feasibility-Brad Kisor/Coldwell Banker-5729 Littlerock Road
Retail, drive-thru bank, or fast food

Preliminary-Frank Kirkbride-5745 Littlerock Road
Construction of two buildings, parking area, stormwater treatment and detention facilities 

Preliminary-Eric Rowe/Jeff Shyder-8080 Center Street
Addition of batting cage and associated parking lot

Formal-Robert Tauscher-202 Lee Street
12,032 sq. ft. of general commercial development (4 buildings)

Formal-Simon/Johnson, LLC- Cleanwater Lane
Four 5-story government buildings, 5600 sq. ft. daycare facility & road improvements

Back to Top


July 2002

Presubmission-Don Pettie-1520 Irving Sreet|
Demolish holding facilities and remodel existing office space

Presubmission-Glenna Gerdts-5120 Henderson Blvd
Subdivide and develop with single family residences or duplexes or both

Feasibility-Hatton, Godat, Pantier-1600 block of Bishop Road
Two tri-plexes and two duplexes 

Feasibility-Michael T. Peterson-6230 Capitol Blvd
Provide an impervious parking surface

Feasibility-Kevin Stormans-6135 Capitol Blvd
Placement of up to 4 mobile containers for storage of tables, chairs, tents, etc.

Preliminary-The Shea Group/Cathie Carlson-7380 New Market Street
Two 100,000 sq. ft. 4-story office buildings with plaza and landscaping

Preliminary-Curt Heinhold-7702 Terminal Street
Addition of about 117 parking spaces to accommodate potential airline service 

Preliminary-Glenn Wells-Capitol Blvd. Between Israel & Airdustrial
205,000 sq. ft. office with 582 parking stalls

Formal-Glenn Wells-Capitol Blvd. Between Israel & Airdustrial
205,591 sq. ft. office building with 579 parking stalls

Back to Top


June 2002

Presubmission-Patricia Mateljak-231 Lark Street
Division of parcel into 2-single-family homes and 1 multi-family unit

Presubmission-Jack & Ruthanne Zilla-715-719 Linwood Ave. SW
Divide existing parcel with house & duplex into 2 parcels

Presubmission-David & Martha Heiser-N. side Irving, west of 9th 3 or 4 lots with single-family and/or duplexes

Feasibility-Loren Allerdings-1205 Irving St.
Land clearing, drainage issues and future project possibilities

Feasibility-The Shea Group/Cathie Carlson-7380 SW New Market St.
Two 100,000 sq. ft. government office buildings with parking

Feasibility-Bill Davis-Between Bishop Rd. & Odegard Rd.
Duplex and triplex construction

Feasibility-Robert Stonefelt/Doug Martin-5111 Joppa St. NW
Construct 18.5' x 30' addition to existing 893.5 sq. ft. office for Schwan's

Preliminary-Glenn Wells-NE corner of New Market & 73rd Ave.
112,684 sq. ft. office building

Preliminary-Glenn Wells- SE corner of Capitol & Israel
100,000 sq. ft. office building

Preliminary-Jerrod Overstreet-2815 - 29th Ave. SW
Indoor skate park in existing warehouse

Preliminary-Robert Stonefelt/Doug Martin-5111 Joppa St. SW
Construct a 555 sq. ft. addition to existing office of Schwan's

Formal-Brian Reynolds-7651 Old Hwy. 99 SE
Remove existing plane port and construct an 11,200 sq. ft. storage hangar

Formal-Scott Anderson-3166 Cougar Lane SW
Office/warehouse distribution facility with parking, loading docks, etc

Formal-Stan Gass-1840 Trosper Rd. SW
Multi-family residential development

Back to Top


May 2002

Presubmission-Hodges Commercial- SE corner Airdustrial & Hwy 99
Land division with 2 different proposals for retail and/or commercia
l

Feasibility-Steve Craig/City of Tumwater-5200 Palermo Street SW
Demolish a 45' x 50' wood structure and construct a 30' x 50' steel building

Feasibility-Tim & Tammy Stampfli-4512 Cleveland Ave. SE
Requirements for property for single-family or manufactured home use

Feasibility-Brad Kisor-5727 Littlerock Road
Addition of a bank or fast food and additional retail

Preliminary-JWMA/Robert Tauscher-202 Lee St. SW
Construction of three 3,000 sq. ft. buildings and one 2,500 sq. ft. building

Preliminary-Douglas Pederson/Rise, Inc.-5725 Littlerock Rd. SW
A 7,164 sq. ft. new building, a 5,037 sq. ft. remodel, and a 1,548 sq. ft. canopy for Mills & Mills Funeral Home

Preliminary-Scott Lawson-SE corner of R.W. Johnson Blvd.
11 buildings, 91,285 sq. ft. (520 units) - self-storage facility and 2,176 sq. ft. office/caretaker residence for Money Saver mini-storage

Back to Top


April 2002

Presubmission-Kirby Cook-Mottman Industrial Park
Short Plat

Feasibility-Glenn Wells-New Market St. & 73rd Ave
112,684 sq. ft. office space with 394 parking stalls

Feasibility-Glenn Wells-Capitol Blvd. & Israel Road
95,600 sq. ft. office space with 367 parking stalls

Feasibility-Norman Peterson-1515 Bishop Road
22-unit apartment/condo building

Feasibility-John Purtteman-2815 - 29th Avenue
Expand current Norse building by 3,600 sq. ft.

Feasibility-Jeff Powell- I-5 & Israel Road
27.5-acre mixed use development

Feasibility-Barbara Pettus-Chapparel Road
Improvements to 5-acre parcel at end of Chapparel Road

Feasibility-Leslie Ragan-220 "C" Street SE
Building addition and sanctuary expansion for New Life Center

Feasibility-Duane Hicks-100 Custer Way
Paving for maintenance & improvements to parking area for Miller Brewing

Feasibility-SCA Consulting Group-2149 Sapp Road
33-lot single-family subdivision, request for preliminary plat & BLA

Feasibility-Duane Hicks/CH2 M Hill-Cleveland & Yelm Hwy
Installation of pipeline from Miller Brewery to the Rainier Power Plant

Preliminary-Hatton, Godat & Pantier-2943 - 29th Avenue SW
Installation of a 7,200 sq. ft. warehouse and associated utility connections

Preliminary-Ed Wiltsie/Morrissette-6400 Capitol Blvd. SE
Expansion and improvements for Courtyard Nursery

Back to Top


March 2002

Presubmission-Dick Campbell-210 Pinehurst Drive
Commercial building site plan

Feasibility-Kris O'Bannon-2943 - 29th Avenue
Addition of 1,500 sq. ft. to existing building

Feasibility-Earl Pearson/Roy Allen-7529 Old Hwy 99
Enlarge an 8,000 sq. ft. hangar by an additional 8,000 sq. ft.

Feasibility-Kaufman Brothers Construction-3035 - 37th Avenue
2,800 sq. ft. addition to existing 9,200 sq.ft. building

Feasibility-Brent Rakestraw-7130 Littlerock Road
New American Legion outpost banquet facilities - construct 6,700 sq. ft. building or small office park

Preliminary-Thomas Taylor-6510 Capitol Blvd
Remodel existing law office building and add 1,610 sq. ft. to include 3 offices & a conference room

Preliminary-Barnett Davis-NE corner of New Market & Airdustrial
Administrative facility of 140,000 sq. ft. & parking

Back to Top


February 2002

Presubmission-Boys & Girls Club-700 Israel Road
Conversion and remodel of metal storage building and placement of new modular building

Feasibility-John Turner-6715 Stanton Court
Water, sewer, fire protection, and other info to determine project costs

Feasibility-Barnett Davis-NE corner of New Market & Airdustrial
Administrative facility of 140,000 sq. ft. with parking

Feasibility-Dennis Craig/Tom Dowling-Beehive Industrial, lot #6
Construction of 2 warehouse buildings

Feasibility-Andy Schandle & Mark Terwilleger-7136 Littlerock Road
Construction of a 12,000 to 14,000 sq. ft. building & warehouse

Feasibility-Darvin E. Barnes-940 Israel Road
50,000 sq. ft. addition for worship center and support facilities

Feasibility-Granville (Beaver) Brinkman-230 Dennis Street
Increase of current density in order to construct a 50-unit apartment complex

Preliminary-Stan Gass-1840 Trosper (54th Ave) Road
Construction of 144 - 2 & 3 bedroom townhouses and 1 & 2-bedroom flats

Preliminary-Peter Alef-2925 - 37th Avenue
Construction & relocation of coroner's office

Preliminary-Glen Wells-New Market Street & 73rd Avenue
Phase 1: 205,000 sq. ft. office space with parking

Back to Top


January 2002

Presubmission-Bruce Studeman-West side of 2nd Avenue
Short plat

Feasibility-Shawn Bridgeman-2840-C Black Lake Blvd
Approval to operate a child care learning center

Feasibility-Jerry Erwin & Bill Wagner-1400 Trosper Road
94-unit, 4-story senior apartments with services

Feasibility-Tim Holderman, Sound Engineering-7643 Old Hwy 99
Construction of office buildings

Feasibility-Jeff Powell- West side of I-5, north side of Israel Road
Construct 250 units (apartments) on 12 acres

Feasibility-R. C. Newman-1520, 1532, & l610 Bishop Rd
Demolition of 3 structures and construction of 4 commercial buildings

Preliminary-Glenn Wells-SE corner of Capitol Blvd & Israel Road
Construction of offices, multi-family units., and retail space

Preliminary-Steve Yester, MC Construction-5232 Joppa Street
Tenant improvements: parking, access, and storm water system

Preliminary-Anderson & Boone-Lots 5, 6, & 8 Mottman Business
Park
Site development of 54,000 sq. ft. facility for Black Hills Distributing