City of Tumwater
Development Reviews: 1996 Year-to-Date

December 1996
November 1996

October 1996

September 1996

August 1996

July 1996

June 1996

May 1996

April 1996

March 1996

February 1996

January 1996


DECEMBER 1996

Feasibility-Buddy Davis-603 Irving Street SW
Remodel and expand current single-family residence into three 2-story attached single-family units

Feasibility-Cleve Pinnix-"C" Street SW
Construction of a three single-family residences or two duplexes

Presubmission-Deering & Nelson, Inc.-North side of Sapp Rd.
31-lot residential plat

Presubmission-Robert Connolly-66th Avenue SW
Review of binding site plan for 10.7 acre multi-family development

Presubmission-Greg Gurske-3814 Antsen Street SW
4-lot single-family residential short plat

Preliminary-Berschauer-Phillips-R.W. Johnson Blvd. SW
23-lot commercial/industrial plat

Preliminary-Michael Weinstein-6504 Capitol Blvd. & 101 "Z" St.
Group foster home for 24 juveniles

Preliminary-Walt Kjorsvik-R.W. Johnson Blvd.
Development of a 21-lot single-family residential plat

Preliminary-Rich Nevitt-Crosby Blvd. SW
24-lot single-family residential plat

Preliminary-Kent Morrison-6131 Capitol Blvd.
Remove old canopy, tanks, pumps, and piping, and install new canopy, tanks & equipment

Preliminary-Bob Slenes-5150 Capitol Blvd.
Remodel of, and addition to, existing Brewery City Pizza

Back to Development Reviews: 1996 Year-to-Date


NOVEMBER 1996

Feasibility-Ron Rowe-S. side of Airdustrial Way
Development of 3-acre commercial site to include mini-mart, fuel island, and car wash, and phase II to include possibly 5 other buildings with 30,500 square feet of floor area

Feasibility-Heritage Fine Homes-1617 Bishop Road SW
Construction of 5-plex

Feasibility-Brad Kisor/Joel Baker-Mottman Road Interchange (SE)
Construction of a 50-unit hotel

Feasibility-Ken Buchanan-1520 Bishop Road
Construction of three 4-plexes and one 6-plex

Presubmission Conference-Doug Tallman-North Street SE
Two-lot residential short plat

Presubmission Conference-Bob Greenway-Lake Park Drive SW
Three-lot residential short plat

Presubmission Conference-McFaul/Levinson-Ferguson Street SW
Binding Site Plan for parcel 3 of Mottman Industrial Village

Presubmission Conference-Ralph J. Bissonnette-Kirsop and Miner
Two-lot residential short plat

Formal-Scott Anderson-3030 32nd Avenue SW
Construction of a one-story tilt-up concrete warehouse

Back to Development Reviews: 1996 Year-to-Date


October 1996

Feasibility- Mark Beardemphl-7018 Littlerock Rd.
Construction of a mini-storage and R.V. storage facility

Feasibility- Joe Mitter-Linda Street
Construction of a parking lot for park access being developed by Chinook Uniserv

Feasibility- Obie Hagge-705 "T" Street
Development of a cooperative senior housing development to consist of approximately 100 units consisting of apartments, duplex, and 4-plex units

Feasibility-Paul Casey-Capitol Blvd. at Airdustrial
Development of a retail/office center with a convenience store and 4 fuel pumps

Feasibility-Eugene Thompson-5101 Capitol Blvd.
Construction of a 1,378 sf, 2-bay Q-Lube facility

Feasibility-Michael Weinstein-101 "Z" St and 6504 Capitol Blvd.
Group foster home for 24 juveniles

Preliminary-Ron Taylor-667 & 669 Israel Rd
2-lot short subdivision

Preliminary-Matt Russell-Ensley at Cleveland Ave
Construction of a 3,500 sf professional/commercial building

Preliminary-E.A. Wiltsie-South of Airdustrial @ I5
Construction of 40,000 sf Country Inns Motel

Preliminary-Harold's Petroleum Inc.-6131 Capitol Blvd.
Removal of 3 fuel tanks, and replace with 2 new fuel tanks, canopy, and fuel islands

Formal-Steve Hatton-Tumwater Valley Drive
Construction of a 6,418 sf one-story child care facility and a 9,525 sf two-story office/retail building

Formal-Sheila Swalling-700 Israel Road
Modernization of existing high school

Back to Development Reviews: 1996 Year-to-Date


SEPTEMBER 1996

Presubmission-Michael & Kristyn Andrews-633 "V" St
Four-lot single-family residential short plat

Presubmission-Joe Bedard-"C" Street & 5th Ave
Three-lot residential short plat

Feasibility-Jay Kincy-5950 Littlerock Rd
Use of existing building as a warehouse/shop and possible use of house next door for storage

Feasibility-Esther Hendricksen-6350 Capitol Blvd.
110' x 50' addition to existing building-Senior Advocates

Feasibility-Dorothy Payne/Loraine Pyfer-W of Lake Park Dr
Construction of a duplex or townhouse on the high side of the lot

Preliminary-Esther Hendricksen-Trosper & Littlerock Rd
Shell service station and convenience store

Preliminary-Bob Slenes-4833 Tumwater Valley Dr. SW
Construction of an office/retail and child care center building

Formal-John Martin-7643 Old Hwy 99
Construction of a fuel storage and distribution facility

Back to Development Reviews: 1996 Year-to-Date


AUGUST 1996

Presubmission-Ray Abbot-Sapp and R.W Johnson
Development of a 4.1 acre single-family residential plat

Presubmission-Scott Richardson-710 Dennis Street SE
Development of a five-lot plat.

Presubmission-Darrel Mullenhour-655 Pioneer Street
Four-lot residential short plat

Feasibility-Frank Webley-501 Trosper Road
Relocate existing drive-thru/walk-up espresso business to site

Feasibility-Scott Gubbe-5203 Capitol Blvd
Replace espresso building with a larger one; landscape and make connection to City water and sewer

Preliminary-P.B.J. Contracting-R.W. Johnson Blvd
Review of preliminary plat application for 23 commercial-industrial lots and 9 single-family lots

Preliminary-Alan D. Toelle-7370 Linderson Way
Extend existing tank farm to east and construct above ground petroleum storage tank and spill containment system

Preliminary-Scott Anderson-3265 Ferguson Street
Construct 71,950 sf one-story, type IIN warehouse
Containers Northwest Company warehouse

Preliminary-Scott Anderson-3265 Ferguson Street
Containers NW-construction of 5,376 sf 2-story office bldg

Formal-Curt Heinold-Ferguson Street SW
Construction of 5,880 sf office/warehouse manufacturing bldg

Formal-Glenn Wells-5757 Littlerock Road
Construction of 7,500 sf community bldg & site improvements

Formal-Todd Mason-Old Highway 99
Construction of a 420' x 50' metal building for aircraft storage.

Back to Development Reviews: 1996 Year-to-Date


JULY 1996

Presubmission-Roger Thompson-"C" Street SW
Division of one existing parcel into two lots

Feasibility-Rod Davies-2943 R.W. Johnson Blvd
Operation of a heavy duty truck wrecking and repairing facility

Feasibility-Jim Jensen/Dan Holcomb- Port of Olympia
Installation of a system to process food residuals and organic bulking materials to produce vermicastings, a high quality soil amendment

Feasibility-Robert Carey-2505-21st Avenue
Operate commercial truck dealership

Feasibility-Timber Country Homes L.L.C.-6755 Stanton Ct.
Development of 5 multi-family units

Feasibility-Robert Wuotila-Airdustrial Way/Capitol Blvd.
Development of a retail/office complex consisting of minimart w/6-pump service station, 2-story office/retail building, and one story retail building

Feasibility-Steve Southgate-Port of Olympia
Development of a facility to process post and pre food waste into a product to be sold as topsoil and potting soil

Preliminary-Tumwater School Dist. #33-700 Israel Rd.
Modernization of existing high school

Preliminary Review-P.B.J. Contracting-R.W. Johnson Blvd.
Review of preliminary plat for 23 commercial-industrial lots and 9 single-family lots

Preliminary-Tumwater-Airdustrial/Linderson/Capitol
Add bike paths and storm drainage improvements and repave existing roadway

Formal-Ron Shipley/TSD #33-2020 - 80th Avenue SW
Construction of a transportation, maintenance, and food service facility

Formal-Jim & Lynn Thompson-Sapp Road SW
Development of a 60-lot residential plat/review of revised drawings

Back to Development Reviews: 1996 Year-to-Date


JUNE 1996

Presubmission-Chance Wehrer-Irving Street

4-lot short plat

Presubmission-Greg Johnson-4512 Cleveland Ave.
2-lot short plat and construction of two single family residences or duplexes

Feasibility-Lee Ingrim-4800 Capitol Blvd
Construction of a drive-thru espresso stand

Feasibility-Alan D. Toelle-7370 Linderson Way
Extend existing tank farm to the east and construct an above ground petroleum storage tank and spill containment system

Feasibility-Gary Bolster-Old Hway. 99 Aircraft Hangarage
Construction of a 19-unit hangar and a possible second 19-units

Preliminary-Tumwater School Dist.-Kimmie Support Facility
Construction of a new transportation, maintenance, and foods facility

Formal-Thomas Balbo-32nd Ave. & R.W. Johnson Blvd.
Construction of a two-story building to include a 39,000 sf detention area and a 38,000 sf court and administrative support area

Formal-Jim and Lynn Thompson-Sapp Road
Apple Hill Preliminary Plat, development of a 60-lot residential plat

Formal-E.A. Wiltsie, PE-Airdustrial Way/ Center Street
Development of commercial core infrastructure

Formal-Craig McClelland-5232 Joppa Street
Change in use of property to a repair garage and welding room.

Back to Development Reviews: 1996 Year-to-Date


MAY 1996

Feasibility-P.B.J. Commercial/Residential-R.W. Johnson Blvd
Development of a 23-lot commercial and a 9-lot residential subdivision

Feasibility-Tumwater Block A Development
Construction of a single-family residence and associated improvements

Feasibility-Barnes Block 35 and 36 Development
Planned Unit Development or construction of townhomes

Feasibility-Family Entertainment Center- Israel Road
Construction of a 30,000 s.f. center with miniature golf, laser tag, batting cages, etc.

Feasibility-Tumwater Multi-Purpose-4833 Tumwater Valley
Construction of a 20,000 s.f. multi-purpose building.

Feasibility-Cleveland Avenue Office/Residential Building
Construction of a 3,000 s.f. office/retail building with 3 or 4 apartments above

Feasibility-Controlled Rain-5205 Lambskin St.
Use of an existing building for a landscape and irrigation business

Presubmission-Chapparel Drive Single-Family Plat
Development of single-family plat at Chapparel Drive and Antsen Road

Presubmission-Short Subdivision-3602 Lorne Street
Divide property to create 2 residential lots

Presubmission-Viewpoint Estates-Crosby Boulevard
Subdivide approximately 10 acres into 30 single-family lots

Presubmission-Streamland Estates-Sapp and Antsen Road
Subdivision of approximately 25.1 acres into 46 single-family lots

Presubmission-Long Plat-Liberty Street
Subdivide approximately 6.74 acres into 30-40 single-family lots

Preliminary-Commercial Core Infrastructure-Airdustrial Park
Infrastructure on Airdustrial Way, Kimmie Street and Center Street

Preliminary-Kimmie St. Improvements-Airdustrial Park
Improvements to Kimmie Street including a 24-foot roadway and sanitary sewer

Back to Development Reviews: 1996 Year-to-Date


APRIL 1996

Feasibility-Schwan's Ice Cream Addition-5111 Joppa St.
Addition of 144 s.f. to existing office area

Feasibility-Vehicle Service Facility-SW corner of Trosper & Littlerock
Construction of an approximate 3,000 s.f. commercial convenience center

Feasibility-Mottman Fish Passage-Percival Creek @ Mottman
Construction of a fish passage facility

Feasibility-Mike Nunn-5880 Linderson Way
Use of warehouse & lot for wholesale/retail distribution of drywall

Preliminary-Michael Nunn-5880 Linderson Way
Use of existing building for drywall supply business

Preliminary-Mottman Rd Mini Storage-2030 Mottman Rd
Construction of a 45,000 s.f. mini storage and RV parking facility

Preliminary-Community Resource Center-2nd & Bates
Conversion of old city hall into a community resource center

Formal-Kildow Bros. Remodel-6400 Capitol Blvd.
Remodel existing structure for new commercial uses including a nursery, landscape company, office, barbershop, and a bakery/delicatessen

Formal-Taco Bell-182 Trosper Rd
Construction of a 2,122 s.f. Taco Bell restaurant

Back to Development Reviews: 1996 Year-to-Date


MARCH 1996

Feasibility-Rick Lentz-5150 Capitol Blvd.
Tenant improvement on existing building for Taco Time restaurant, to include a drive-up window and parking lot restriping

Feasibility-Don Dodge-7527, 7531 & 7533 Trails End Drive
Create an easement to back of lot to construct more residential units

Feasibility-Thurston County-32nd Ave/R.W. Johnson Blvd
Construction of a juvenile detention center

Feasibility-Jerry W. Scott-5202/5206 and 5208 Capitol Blvd.
Construction of a 3,000 s.f. restaurant and parking area

Feasibility-John Partsch-4th & "L" Streets SW
Construction of a single family residence

Feasibility-W. Ken Lilliquist-6601 Stanton Ct. SW
Short plat of a residential lot

Feasibility-John Martin, TRA-7643 Old Highway 99 SE
Construction of a fuel facility

Preliminary-Ron Shipley-Port of Olympia
Construction of a new support facility to house buses/vehicles, repair facility, custodial/maintenance/grounds, food

Preliminary-James Kildow-6400 Capitol Blvd
Remodel existing structure to allow for additional commercial uses to include nursery, landscape co. office, barbershop, and a bakery/deli

Preliminary-Anderson & Boone-6518 Capitol Blvd
Construction of a one-story commercial building and parking area

Formal-Scott Anderson-6518 Capitol Blvd
Construction of a one-story commercial building and parking area

Back to Development Reviews: 1996 Year-to-Date


FEBRUARY 1996

Feasibility-Ken Stormans- 6135 Capitol Blvd
Place three 10'x20' storage units on the northwest portion of the site to store rental equipment

Feasibility-Harbor Wholesale-7845 Center Street
Construction of a 19,400 s.f. addition to an existing commercial structure; reconfiguration of the parking area and site access

Feasibility-James Kildow-6400 Capitol Blvd.
Remodel an existing nursery building to allow for new commercial uses in addition to existing businesses

Feasibility-Hyo Jin So-7021 Lazy Ct.
Construction of 2 duplexes and connection to city utilities in the Urban Growth Area

Feasibility-Gary Wells-2502 21st Avenue
Use of an existing building and property as a public vehicle auction site

Feasibility-Bill Carlyle-1617 Bishop Road
Construction of a 5-unit townhouse and extension of sanitary sewer to serve the site

Feasibility-Tracy & Mark Duncan-6325 Capitol Blvd.
Conversion of an existing single family residence to a child day care use

Feasibility-Ken Buchanan-1520 Bishop Road
Construction of a mini-storage facility at the end of Bishop Road

Presubmission-Charlie Grate-Sapp Road W of R.W. Johnson
Development of a 28-lot residential subdivision on eight acres

Presubmission-Ron Taylor-667 & 679 Israel Road
2-lot short plat to separate two 4-unit apartment buildings on one lot

Presubmission-Ray Abbott-Sapp Road at R.W. Johnson
Development of a 21-lot single family residential plat

Presubmission-Rich Nevitt-Sapp Road at Antsen Road
Development of a 46-lot residential plat

Preliminary-Ken Buchanan-6518 Capitol Blvd
Construction of a one story commercial structure and parking north of Dairy Queen

Formal-Port of Olympia-7643 Old Highway 99
Construction/reconstruction asphalt apron, taxi lane, and parking at Olympia Airport

Formal-George and Dave Minks-5229 Littlerock Road
Construction of a 14,612 s.f. retail center for Homespun Crafts and Antiques with 40 on-site and 27 joint use parking spaces

Back to Development Reviews: 1996 Year-to-Date


JANUARY 1996

Preliminary-Mary McClaflin-5232 Joppa Street
Change of Ownership, mobile home parts sales and repair business

Preliminary-Keith Weaver-9th and Mottman
Preliminary plat of Tumwater Heights; development of a 16-lot single-family subdivision.

Preliminary-Mark Napier-7643 Old Hwy 99
Reconstruction of asphalt apron and taxi lane at Olympia Airport

Preliminary-Jim Thompson-2335 Sapp Road
Preliminary plat of Apple Hill; development of 61-lot single-family subdivision.

Preliminary-Edward Wiltsie-Port of Olympia, Center Street
Construct water and sewer lines for future motel and restaurant sites.

Preliminary-Carl Pinscher-New Market Square, Trosper Road
Construct two single story retail buildings (31,500 s.f.).

Formal-Harold Dalke -521 North Street
Addition to existing structure for treatment facility for children with language disorders.

Formal-Jeff Stuart-955 Malin Lane
Revised site plan; construct office building and detached airplane hanger.

Formal-ASKA Plastics-SE corner Center Street at 78th Avenue
Application to construct 6,500 s.f. injection molding plastics plant and a 2,500 s.f. office.

Back to Development Reviews: 1996 Year-to-Date



Back to Development Reviews

Updated: March 4, 2008